Stung Battambang II
13
Station name | Stung Battambang II |
Project purpose | Hydropower dam |
Investor | KTC (Korea) |
Country | Korea |
Power generation capacity (MW) | 36 |
Energy generated per year (GWh) | 187 |
Year of scheduled commencement | 2019 |
Commune | Kampong Lpov |
District | Samlot |
Province | Battambang |
Scale of Dam | Medium scale |
Status | Potential site |
Detail status | Unknown |
EIA date | Not found |
EIA status | Not found |
Reference documents
Final Report on Data Collection Survey on Electric Power Sector in Cambodia
|
A final data collection survey on electric power sector in Cambodia prepared by JICA. The purpose of the study is to grasp the latest trend in the power sector in Cambodia, and to collect and collate the data needed to examine specific areas where cooperation is required in this sector. The study was supported by the Ministry of Industry, Mines and Energy (MIME), the Electricity Authority of Cambodia, and the Electricité du Cambodge (EDC). The road map covering the study is shown in the report. |
Electricité Du Cambodge: Annual Report 2015
|
The Annual Report 2014 of Electricité Du Cambodge (EDC) is focused on electricity sector in Cambodia during the year of 2014. This report includes the information of management structure of EDC institution, the energy productions by types of power plant such as fuel oil, hydro, biomass, coal, and imported energy at the high voltage from Thailand and Vietnam, demand and supply, transmission and distribution networks in Cambodia, and statement of income of ECD in 2013 and 2014. |
Development of energy sector in Cambodia
|
The presentation slides draw a general picture of Cambodia's energy sector and its development plan. Sources of the energy come from hydropower, coal, natural gas, crude oil and imported electricity. By 2030, at least 70% of residence across the country will have an access to electricity. |
Progress of Cambodia power development plans and transmission interconnection projects
|
The presentation slides were prepared for the 8th Meeting of the Focal Group (FG-8) of the Greater Mekong Sub-region (GMS), on 26 November 2009, at Luangprabang of the Lao People's Democratic Republic. The current development of Cambodia's power sector, and outlook of power development plan are making integral parts of the presentation. |
Progress of Cambodia Power Development Plans & Transmission Interconnection Projects
|
This presentation is prepared by Electricité du Cambodge (EDC). It focused on Current Development of Power Sector and Outlook of Power Development Plan. |
Presentation on small hydropower for developing countries: Cambodia
|
This brief presentation introduces with the objectives of energy policy, which has established since October 1994, followed by a list of maps of potential macro and micro hydropower projects in Cambodia. In conclusion part, an acknowledgement of a lacking technical capacity among responsible staffs of the hydro electricity department was stated, thus the department is in need of assistance to improve on the fields. |