Company |
EVN International Joint Stock Company |
Company profile |
Not found |
Registration investment capital |
USD 816.23,000,000 |
Company registration date |
Not found |
Company registration code |
Not found |
Director |
Mr. Lam Du Son (Vice-president) |
Director residence |
Vietnam |
Company address |
Vietnam |
Type of EIA reports |
Feasible study of Environmental Impact Assessment |
State agency |
Ministry of Mines and Energy |
Site |
The Lower Sesan 2 hydro-electric power project is located on the Sesan River in four communes in the Sesan district. It is approximately 1.5 kilometers downstream of the Sesan and Srepok Rivers, and about 25 kilometers upstream of Stung Treng province. |
Village |
Not found |
Commune |
Pluk, Srekor, Talat, and Kbal Romeas |
District |
Sesan |
Province |
Stung Treng |
Contract duration |
Not found |
Area size of project |
The reservoir has a storage capacity of 1.79 billion cubic meters and a flooded area of 335 square kilometers when the water level reaches 75 meters.
|
sector |
Hydropower |
EIA company |
Power Engineering Consulting Joint Stock Company |
Backgrounds of EIA company |
Nof found |
Address of EIAs company |
Km9+200, Nguyen Trai, Thanh Xuan, Hanoi, Vietnam
Tel: (84) 042148006, Fax: (84) 048541208 |
Relevants law |
Constitution, Law on Environmental Protection and Natural Resources Managment, Royal Decree on Natural Protected Areas, Sub-Decree on Environmental Impact Assessment Process, Sub-decree on Water Pollution Control, Sub-decree on Solid Waste Management, Land Law, Forestry Law, Law of Water Resources Management, National Water Resources Policy, and Mekong agreement and Procedural Rules. |
Revenues and expenditures |
Not found |
Social alnd environmental impacts |
The project will provide a sustainable power supply, construct new access roads to the project site, provide jobs to Cambodian workers, rehabilitate infrastructure roads, culverts, bridges, and other infrastructure to increase the potential value of the ecotourism. The project will create income for the local and national people by providing jobs in the construction and operation stages. The output through an annual energy production of 1,953.9 GWh will have a positive impact on the economic development of Cambodia. |
Employment opportunity |
The project will need a workforce of 1,300 people during the four years of construction. |
Public participation |
The public was consulted three times about the dam proposal during the preparation of the EIA. The first time was a public meeting with the 5 most affected communes held by KCC in early February 2008. The second time was held by PECC in April 2008. The third consultation was in May 2008 with the representative of the government, NGOs, the private sector, and the community. |
Land converted from |
The dam can cause a flood of 335 square kilometers, including 40-60 cubic meters of inundations across the Sesan and Srepok riverside, and flood four villages and partially flood three villages. |
Environmental management plan |
The environmental management plan consists of institutional arrangements, a summary of mitigation measures, and monitoring programs. The mitigation measure and monitoring programs will include the frequency schedule, institution, and budget. |
Development plan |
Not found |
Mitigation strategies |
The study team used the environmental checklist in the EIA guideline of ADB 2003 for Hydropower projects. The mitigation measures for each impact are designed to reduce the impacts as much as possible. Each environmental impact is described, followed by recommended mitigation measures for the different project phases: pre-construction, construction, and operation. |
Environmental and social funds |
Not found |
EIA publication year |
2008 |