22
Station name | Stung Cheay Areng Dam |
Project purpose | Hydropower dam |
Investor | China Guodian Corporation (China Guodian) |
Country | China |
Power generation capacity (MW) | 108 |
Energy generated per year (GWh) | Unknown |
Year of scheduled commencement | 2016 |
Commune | Pralay |
District | Thma Bang |
Province | Koh Kong |
Scale of Dam | Large scale |
Status | Under study |
Detail status | Unknown |
EIA date | 1/1/2008 |
EIA status | Feasibility Study |
Reference documents
Opposition to proposed Stung Cheay Areng Dam
|
The site for proposed 260-MW Stung Cheay Areng Dam is located in Central Cardamom Protected Forest. China-based Sinohydro Resources is contracted by the Cambodian government for the construction of the dam. According to a researcher of the Princeton University-based international affair, If the dam is established, adverse effect is expected to flood local villages, affects indigenous people by inundate their lands and affects the natural habitat of endangered wildlife of the Siamese crocodile. |
Stung Cheay Areng Hydropower Dam: Brief
|
This brief summary about Stung Cheay Areng Hydropower dam by the Earthrights International outlines the general overview, involvement of the Chinese companies in the project, its environmental, social and cultural impacts as well as a highlight of the conflict between local communities and project developer. The Stung Cheay Areng Hydropower dam is located at the Stung Areng valley of Koh Kong province, which is home to approximately 1500 people.The feasibility study for Stung Cheay Areng Hydropower Project is reportedly completed with a production capacity of 108MW and a total cost of USD $327 million. |
Concession Bibliography
|
This bibliography provided full list of documents about studies on economic land concession, the push and full factors of myth of development in Cambodia, rural livelihood and social development issues addressed in various sources. Furthermore, legal framework: sub-decree, law, directive and policy related to land issues and social development. The documents were gathered from government ministries (ministry of Economic & Finance; Ministry of Land Management, NGOs Forum on Cambodia. In addition, several case study and general information at both regional and international on mining concession in Cambodia were also available. The above information were available at NGOs Forum on Cambodia website which compiled by the Land and Livelihoods Programme. |
Concession bibliography
|
The concession biography is compiled by the land and livelihood program of NGO Forum on Cambodia. A list of the publications and laws extends over various issues of (economic land/mining) concessions and its impact on the people livelihood, land conflict, land grabs, and the regional trends in South East Asia. |
Concession Bibliography
|
A webpage showing list showing report of case studies on various concessions or land related investment issues. |
Development of energy sector in Cambodia
|
The presentation slides draw a general picture of Cambodia's energy sector and its development plan. Sources of the energy come from hydropower, coal, natural gas, crude oil and imported electricity. By 2030, at least 70% of residence across the country will have an access to electricity. |
Progress of Cambodia Power Development Plans & Transmission Interconnection Projects
|
This presentation is prepared by Electricité du Cambodge (EDC). It focused on Current Development of Power Sector and Outlook of Power Development Plan. |
Progress of Cambodia power development plans and transmission interconnection projects
|
The presentation slides were prepared for the 8th Meeting of the Focal Group (FG-8) of the Greater Mekong Sub-region (GMS), on 26 November 2009, at Luangprabang of the Lao People's Democratic Republic. The current development of Cambodia's power sector, and outlook of power development plan are making integral parts of the presentation. |
Presentation on small hydropower for developing countries: Cambodia
|
This brief presentation introduces with the objectives of energy policy, which has established since October 1994, followed by a list of maps of potential macro and micro hydropower projects in Cambodia. In conclusion part, an acknowledgement of a lacking technical capacity among responsible staffs of the hydro electricity department was stated, thus the department is in need of assistance to improve on the fields. |
Webpage capture on the article of Stung Chea Areng hydroelectric dam in Koh Kong, Cambodia
|
Webpage capture on the article of Stung Chea Areng hydroelectric dam in Koh Kong, Cambodia shows detailed information about the project, location, investment amount, and specific commodities. |