News
Water flow ‘still weak’ after pipe installation
After blocking a river for months, a construction project’s recently installed water pipes are delivering relief to only some of Battambang’s drought-stricken fields. More than 400 farmers in Bavel district blamed the Asian Development Bank-funded bridge for choking the river since construction began in December, leaving ...
Laignee Barron and Mom Kunthear
http://www.phnompenhpost.com/national/water-flow-%E2%80%98still-weak%E2%80%99-after-pipe-installation