Electricity production

Renewable energy production

Rice husks to pump energy to the grid

Malaysian company PMTI Energy (Cambodia) Co has signed a 10-year deal to supply Electricite du Cambodge with 48,000 megawatts of energy derived from rice husks every year. Phou Puy, president of PMTI, told the Post yesterday that about 70 per cent of the power generated from ...

Chan Muyhong
http://phnompenhpost.com/business/rice-husks-pump-energy-grid

China dam discharges in Mekong

A large-scale hydropower dam in China began releasing a deluge of water from its overfilling reservoir on Friday, leaving downstream neighbours to fear imminent inundation. ...

Laignee Barron
http://phnompenhpost.com/national/china-dam-discharges-mekong

Malaysia's Wah Seong in 10-year power deal with Cambodia

Wah Seong Corporation Bhd’s subsidiary will be selling 48,000 MW of power per annum over 10 years to Cambodia’s power company. Wah Seong said on Friday its subsidiary PMTI Energy (Cambodia) Co Ltd had signed a power purchase deal with the Electricité Du Cambodge to sell ...

The Cambodia Herald News Staff
http://thecambodiaherald.com/cambodia/detail/1?page=13&token=ZTNmM2VkMTNmMDI

In Stung Treng, forests fall before they’re washed away

On the Sesan and Srepok rivers in the northeast, boats of all shapes and sizes lug timber back and forth between the banks. Men wait on craggy land alongside the water with jerry-rigged winches and homemade vehicles to drag precious cargo up steep inclines. Fallen ...

Matt Blomberg
http://www.cambodiadaily.com/news/in-stung-treng-province-communities-fell-their-forests-before-they-are-washed-away-67369/

Cambodia, US share concerns over Lao dam

Following a meeting with a visiting U.S. diplomat on Wednesday, Ministry of Foreign Affairs Secretary of State Ouch Borith said the U.S. shares Cambodia’s concerns about a controversial hydropower dam Laos is planning to build on the Mekong River. Cambodia and Vietnam both fear that the ...

Eang Mengleng
http://www.cambodiadaily.com/news/cambodia-us-share-concerns-over-lao-dam-67238/

Dam ‘redesign’ a mystery

Amid a lawsuit and a chorus of dissent, developers of the first lower Mekong mainstream hydropower project, the massive Xayaburi dam, have quietly submitted a long-anticipated, multimillion-dollar redesign plan, the Post has learned. What exactly has been changed about the 1,260-megawatt dam, which environmentalists contend will ...

Laignee Barron
http://www.phnompenhpost.com/national/dam-%E2%80%98redesign%E2%80%99-mystery

Metfone eyes sites in Areng

In what could be the latest sign that authorities are pushing ahead with the Areng Valley hydropower dam, Vietnam Military Telecommunications Group has sent engineers into the valley in Koh Kong province to scout for locations where its local subsidiary, Metfone, could build mobile phone ...

Daniel Pye
http://www.phnompenhpost.com/national/metfone-eyes-sites-areng

U.S. renewable energy developer eyes investment opportunity in Cambodia

The Willowbrook Company, a New York-based renewable energy development company, is seeking support from Cambodia to build a 250-megawatt solar power plant, the Cambodian Ministry of Commerce said in a statement Friday. Edward J.Sappin, visiting chief executive officer of the Willowbrook Company, urged the support from ...

Xinhuanet News Staff
http://news.xinhuanet.com/english/business/2014-08/22/c_133576584.htm

City Hall blocks bike ride against hydro-project

Phnom Penh security forces on Sunday blocked activists from riding their bicycles around the city to promote their campaign against the pending construction of a hydropower dam in Koh Kong province, claiming the organizers failed to ask City Hall for permission. The NGO Mother Nature has ...

Mech Dara and Zsombor Peter
http://www.cambodiadaily.com/news/city-hall-blocks-bike-ride-against-koh-kong-hydro-project-66695/

6th Chinese-built hydropower dam in Cambodia starts operation

The sixth Chinese-built hydropower plant, located in the Koh Kong province of   southwestern Cambodia, has begun producing electricity after more than four years of construction, the China National Heavy Machinery Corporation (CHMC) said in a  statement  on Thursday. CHMC started to develop the 246-megawatt Tatay River Hydropower Plant in 2010. The dam comprises three generators, each capable of producing 82 megawatts, the statement said. ...

People's Daily Online News Staff
http://english.peopledaily.com.cn/n/2014/0814/c90777-8769756.html

Mekong hydropower could conflict with other benefits: Kerry

US Secretary of State John Kerry said Saturday that hydropower development along the Mekong River could conflict with other benefits. “You have this tension between the purposes, unless they’re approached thoughtfully and correctly,” he told foreign ministers from the Lower Mekong Initiative gathered in Nay Pyi ...

The Cambodia Herald News Staff
http://www.thecambodiaherald.com/cambodia/detail/1?page=11&token=ZDBkZDVhOTQxOTA

Cambodia is perfectly positioned to become a solar powerhouse

Phnom Penh’s first solar-powered building looks for all the world like a cube of colored Lego blocks dropped in a factory lot on the city’s industrial outskirts. Covered in some 1,350 solar panels — including large panes of multi-colored solar glass — the three-story building ...

Sarah Goodyear
http://nextcity.org/daily/entry/water-war-weapon-syria-cities

Laos will consult with neighbors over dam

The Lao government has agreed to a lengthy public consultation process with its neighbors before building a controversial hydropower dam on the Mekong River, within 2 km of the Cambodian border, according to the environmental group WWF. Laos announced the 256-MW Don Sahong dam last year ...

Hul Reaksmey
http://www.cambodiadaily.com/news/laos-will-consult-with-neighbors-over-dam-62740/

Laos agrees to more extensive consultation for dam on border with Cambodia

The Lao government said yesterday that it would have the controversial Don Sahong dam undergo a formal process of prior consultation – a decision that will probably delay the project further. “The government has already demonstrated that it is committed to developing the Don Sahong project ...

The Cambodia Herald News Staff
http://thecambodiaherald.com/cambodia/detail/1?page=13&token=YjI5ZmRlNDg3Y2M

Evictees abandon new land

About half the Koh Kong province villagers relocated to make way for a Union Development Group resort project have abandoned the new homes provided for them, citing poor conditions and an inconvenient location, a village representative said yesterday. More than 1,000 families living in the province’s ...

Phak Seangly
http://www.phnompenhpost.com/national/evictees-abandon-new-land

Officials show Areng families relocation plan

Hundreds of families due to be displaced by the planned 108-MW Stung Chhay Areng dam were called to a meeting Tuesday with provincial authorities, who presented a plan for relocation and then distributed gifts of shrimp paste and MSG. Heng Samnang, a staffer for local NGO ...

Khuon Narim
http://www.cambodiadaily.com/news/officials-show-areng-families-relocation-plan-distribute-food-62348/

Contact us

Contact us

Do you have questions on the content published by Open Development Cambodia (ODC)? We will gladly help you.

Have you found a technical problem or issue on the Open Development Cambodia (ODC) website?

Tell us how we're doing.

Do you have resources that could help expand the Open Development Cambodia (ODC) website? We will review any map data, laws, articles, and documents that we do not yet have and see if we can implement them into our site. Please make sure the resources are in the public domain or fall under a Creative Commons license.

File was deleted
ERROR!

Disclaimer: Open Development Cambodia (ODC) will thoroughly review all submitted resources for integrity and relevancy before the resources are hosted. All hosted resources will be in the public domain, or licensed under Creative Commons. We thank you for your support.

Ss5Pr
* The idea box couldn't be blank! Something's gone wrong, Please Resubmit the form! Please add the code correctly​ first.

Thank you for taking the time to get in contact!