Key road job with longest bridge ‘in 2024’
A groundbreaking ceremony for the construction of a 58km road and bridges crossing the Tonle Sap River connecting Kampong Chhnang to Kampong Thom provinces will be held in 2024, with several relevant ministries assuring that the project would have no serious impact on the environment. …
Sem Pisey
https://www.phnompenhpost.com/national/key-road-job-longest-bridge-2024