Wastewater treatment plant in Southern Phnom Penh to be built in late April
A wastewater treatment plant with the capacity of treating 5,000 cubic metres of wastewater per day will be constructed at the end of April 2021. …
Khmer Times Staff
https://www.khmertimeskh.com/50814427/wastewater-treatment-plant-in-southern-phnom-penh-to-be-built-in-late-april/